Tunnel

1 stories about Tunnel
בניית הרכבת הקלה ב תל אביב

Proximity to Mediterranean Sea May Hamper Work on Tel Aviv Underground

28.05.18|Ofir Dor
Dubbed the Red Line, the first light rail line, scheduled for completion by October 2021, will connect Tel Aviv with neighboring cities in its metropolitan area through a network of above-ground and underground stations
ProfilesEngineServlet?at=39&mi=10&pt=18&dpi=1243103233&pai=cTech&dpn=4409&mt=1